Identimark
Mar 26, 2024
ElectraNet’s hill to hill transmission line project involved building a large transmission line from Port Augusta to Roxby Downs in South Australia providing Prominent Hill mine with direct access to the main electricity grid. The project involved 1128 structures spanning over 270kms.
Meridian's generation assets are located in a picturesque area of New Zealand, attracting both the local public and tourists. This increased foot traffic near their hydro assets necessitated a heightened focus on public safety after concerns were raised during external safety audits.
In 2019, APA commissioned an upgrade to the pipeline, for which we provided bulk supplies and large maintenance projects, including danger high voltage gas signs, marker posts, and non-reflective signage.
Identimark serves industries like energy, utilities, infrastructure, and transportation, specialising in safety products, signage, labeling, and identification solutions
This article delves into the eco-friendly characteristics of U3 signs, spotlighting the...
ElectraNet’s hill to hill transmission line project involved building a large transmission line from Port Augusta to Roxby Downs in South Australia providing Prominent Hill mine with direct access to the main electricity grid. The project involved 1128 structures spanning over 270kms.
Meridian's generation assets are located in a picturesque area of New Zealand, attracting both the local public and tourists. This increased foot traffic near their hydro assets necessitated a heightened focus on public safety after concerns were raised during external safety audits.
This article delves into the eco-friendly characteristics of U3 signs, spotlighting the...
Owner: SA Power
Identimark was approached to address a critical issue on transmission poles within the client’s power network in South Australia.
The identification signs on these poles were fading quickly, requiring frequent replacements.
With transmission poles in proximity to power lines, it was essential to have clear, durable identification markers to prevent accidental contact, a major safety risk for workers and equipment.
Fading signage not only posed a safety risk but also increased maintenance costs for the client due to regular replacements.
The client sought a durable, low-maintenance solution that would withstand the Australian climate and maintain visibility over time.
Identimark worked collaboratively with the client to trial and select U3 signs for these transmission poles. The U3 signs offered several key advantages:
This tailored approach enabled our client to achieve a solution that minimised labor costs, improved safety, and significantly reduced maintenance needs.
The U3 signs’ durability ensures that these transmission poles will remain clearly marked for decades, helping the client save on maintenance and enhancing the safety of the power network.