ElectraNet’s hill to hill transmission line project involved building a large transmission line from Port Augusta to Roxby Downs in South Australia providing Prominent Hill mine with direct access to the main electricity grid. The project involved 1128 structures spanning over 270kms.
Meridian's generation assets are located in a picturesque area of New Zealand, attracting both the local public and tourists. This increased foot traffic near their hydro assets necessitated a heightened focus on public safety after concerns were raised during external safety audits.
In 2019, APA commissioned an upgrade to the pipeline, for which we provided bulk supplies and large maintenance projects, including danger high voltage gas signs, marker posts, and non-reflective signage.
Identimark serves industries like energy, utilities, infrastructure, and transportation, specialising in safety products, signage, labeling, and identification solutions
This article delves into the eco-friendly characteristics of U3 signs, spotlighting the...
ElectraNet’s hill to hill transmission line project involved building a large transmission line from Port Augusta to Roxby Downs in South Australia providing Prominent Hill mine with direct access to the main electricity grid. The project involved 1128 structures spanning over 270kms.
Meridian's generation assets are located in a picturesque area of New Zealand, attracting both the local public and tourists. This increased foot traffic near their hydro assets necessitated a heightened focus on public safety after concerns were raised during external safety audits.
This article delves into the eco-friendly characteristics of U3 signs, spotlighting the...
Owner: Electranet
EPC: Downer Utilities
ElectraNet has completed a new high-voltage power line and upgraded five electricity substations to ensure a secure and reliable electricity supply for the next 50 years in the Eyre Peninsula.
The Eyre Peninsula Link involved the construction of a new double-circuit 132 kV transmission line from Cultana to Port Lincoln, with the ability to upgrade the Cultana to Yadnarie section to 275 kV in the future.
The new line provides increased capacity to connect more users to the electricity network, enabling new renewable energy projects to connect in the future.
The Eyre Peninsula transmission project faced several challenges that needed to be overcome for its successful completion.
The project was built in two stages, and there were very tight timeframes for meeting important milestones.
The remote location of the site, which was a long way to travel, also posed logistical challenges.
Additionally, the COVID-19 pandemic affected the project.
Finally, towards the end of the project, there was a need to turn around signage within a very short time frame, which added to the overall complexity of the project.
Identimark helped ElectraNet to successfully complete the Eyre Peninsula transmission project by supplying and packing aerial ID plates with variable data, danger high voltage signs, and tower identification plates.
Despite facing challenges such as tight timeframes and the remote location of the project, Identimark managed to deliver high-quality products that complied with owner's specifications.
The use of variable data and smaller quantities made it easier for workers on the ground to manage and install the signs.
Identimark's partnership with ElectraNet and their position as a preferred supplier for all transmission signage and assets further cemented their position as a reliable and trusted partner.