Identimark
Mar 26, 2024
ElectraNet’s hill to hill transmission line project involved building a large transmission line from Port Augusta to Roxby Downs in South Australia providing Prominent Hill mine with direct access to the main electricity grid. The project involved 1128 structures spanning over 270kms.
Meridian's generation assets are located in a picturesque area of New Zealand, attracting both the local public and tourists. This increased foot traffic near their hydro assets necessitated a heightened focus on public safety after concerns were raised during external safety audits.
In 2019, APA commissioned an upgrade to the pipeline, for which we provided bulk supplies and large maintenance projects, including danger high voltage gas signs, marker posts, and non-reflective signage.
Identimark serves industries like energy, utilities, infrastructure, and transportation, specialising in safety products, signage, labeling, and identification solutions
This article delves into the eco-friendly characteristics of U3 signs, spotlighting the...
ElectraNet’s hill to hill transmission line project involved building a large transmission line from Port Augusta to Roxby Downs in South Australia providing Prominent Hill mine with direct access to the main electricity grid. The project involved 1128 structures spanning over 270kms.
Meridian's generation assets are located in a picturesque area of New Zealand, attracting both the local public and tourists. This increased foot traffic near their hydro assets necessitated a heightened focus on public safety after concerns were raised during external safety audits.
This article delves into the eco-friendly characteristics of U3 signs, spotlighting the...
Owner: Infratec
Naumai Solar Farm, located in the rural area of Ruawai in Northland, New Zealand, is a forward-thinking project that aims to contribute towards energy independence in the region.
With 7,500 solar panels that track the movement of the sun across the day, this solar farm is designed to provide most of the Ruawai district’s daytime energy needs.
This project is another successful collaboration between Identimark and Infratec, where our expertise in durable signage played a critical role in meeting the project's long-term goals.
Infratec required that the Naumai Solar Farm be equipped to operate efficiently and with minimal maintenance over a 30-year lifespan.
This necessitated the use of high-quality, long-lasting products that could withstand the environmental conditions and ensure reliable performance over the decades.
For this project, Identimark conducted a comprehensive design scope to align with Infratec’s specifications for signage and labeling.
Utilising the benefits of our U3 signage, along with the Nat-gum backing, installation was not only efficient but ensured that the signage would last a lifetime.