Mar 26, 2024
ElectraNet’s hill to hill transmission line project involved building a large transmission line from Port Augusta to Roxby Downs in South Australia providing Prominent Hill mine with direct access to the main electricity grid. The project involved 1128 structures spanning over 270kms.
Meridian's generation assets are located in a picturesque area of New Zealand, attracting both the local public and tourists. This increased foot traffic near their hydro assets necessitated a heightened focus on public safety after concerns were raised during external safety audits.
In 2019, APA commissioned an upgrade to the pipeline, for which we provided bulk supplies and large maintenance projects, including danger high voltage gas signs, marker posts, and non-reflective signage.
Identimark serves industries like energy, utilities, infrastructure, and transportation, specialising in safety products, signage, labeling, and identification solutions
This article delves into the eco-friendly characteristics of U3 signs, spotlighting the...
ElectraNet’s hill to hill transmission line project involved building a large transmission line from Port Augusta to Roxby Downs in South Australia providing Prominent Hill mine with direct access to the main electricity grid. The project involved 1128 structures spanning over 270kms.
Meridian's generation assets are located in a picturesque area of New Zealand, attracting both the local public and tourists. This increased foot traffic near their hydro assets necessitated a heightened focus on public safety after concerns were raised during external safety audits.
This article delves into the eco-friendly characteristics of U3 signs, spotlighting the...
Owner: BHP
EPC: Downer Utilities
The BHP Yarnima transmission line project involved providing the tower and identification signage for the transmission line supplying electricity to the Roy Hill Mine in Newman, Western Australia.
The transmission line was connected to the Newman Power Station, which is a natural gas-fired power station owned by Alinta Energy and servicing BHP Billiton's islanded grid.
The project presented several challenges that our team successfully navigated.
Firstly, the project's remote location posed logistical challenges that required careful planning and coordination to overcome.
Additionally, the need for a quick turnaround meant that our team had to be highly efficient and effective in their execution to ensure the project stayed on track.
Finally, the client's high level of trust in our capabilities meant that our team was under significant pressure to deliver to their exact specifications, adding an additional layer of complexity to the project.
Despite these challenges, our team's expertise and skill enabled them to overcome each obstacle and deliver a successful outcome.
Identimark helped Downer to successfully complete the BHP Yarnima transmission line project by supplying and packing aerial identification plates with variable data, danger high voltage signs, and property identification plates.
Despite facing challenges such as tight timeframes and the remote location of the project, Identimark managed to deliver high-quality products that complied with the project's specifications.
The use of variable data and smaller quantities made it easier for workers on the ground to manage and install the signs.
With a dedication to meeting the client's needs and leveraging their expertise to navigate even the most complex challenges, Identimark was able to deliver a successful outcome for the BHP Yarnima transmission line project.