ElectraNet’s hill to hill transmission line project involved building a large transmission line from Port Augusta to Roxby Downs in South Australia providing Prominent Hill mine with direct access to the main electricity grid. The project involved 1128 structures spanning over 270kms.
Meridian's generation assets are located in a picturesque area of New Zealand, attracting both the local public and tourists. This increased foot traffic near their hydro assets necessitated a heightened focus on public safety after concerns were raised during external safety audits.
In 2019, APA commissioned an upgrade to the pipeline, for which we provided bulk supplies and large maintenance projects, including danger high voltage gas signs, marker posts, and non-reflective signage.
Identimark serves industries like energy, utilities, infrastructure, and transportation, specialising in safety products, signage, labeling, and identification solutions
This article delves into the eco-friendly characteristics of U3 signs, spotlighting the...
ElectraNet’s hill to hill transmission line project involved building a large transmission line from Port Augusta to Roxby Downs in South Australia providing Prominent Hill mine with direct access to the main electricity grid. The project involved 1128 structures spanning over 270kms.
Meridian's generation assets are located in a picturesque area of New Zealand, attracting both the local public and tourists. This increased foot traffic near their hydro assets necessitated a heightened focus on public safety after concerns were raised during external safety audits.
This article delves into the eco-friendly characteristics of U3 signs, spotlighting the...
ElectraNet’s hill to hill transmission line project involved building a large transmission line from Port Augusta to Roxby Downs in South Australia providing Prominent Hill mine with direct access to the main electricity grid. The project involved 1128 structures spanning over 270kms.
Having signs that would withstand the harsh Australian UV and weather conditions was crucial for this project. As the project spanned over 270km the cost of sign replacement is high due to the remote location and expansive area the transmission line covers.
The next challenge was ensuring a smooth installation process for the installation teams. As the project spanned across such a large area, the accuracy of variable data and the order it was packed in was a high priority.
To ensure the project was completed on time the signs for all 1128 structures had to be installed.
Identimark produced and delivered all items to the site for installation on time to avoid commissioning delays which would incur penalties for the contractor.
Using U3 signs on this project were specified which meant that all signage would last and withstand the harsh conditions without fading or breaking, for life.
With a high volume of variable data Identimark labelled and packed each sign set so all items were in the correct order and that all cartons were numbered so the installation team could easily find the items required.
To ensure the project was completed on time the signs for all 1128 structures had to be installed.
Identimark produced and delivered all items to the site for installation on time to avoid commissioning delays which would incur penalties for the contractor.