The Culcairn Solar Farm project wasn’t just large, it was logistically complex and under intense pressure to meet deadlines.
With over 800,000 cable hangers required, the original installation estimates threatened both labour budgets and the overall schedule.
The site’s use of Nextracker’s moving torque tube system also created a unique technical hurdle: routing cables over the motors safely, without interfering with their movement or breaching compliance.
Delays or missteps in material delivery could ripple into costly project hold-ups.
Key challenges included:
Labour efficiency: Thousands of cables needed to be installed fast to keep project costs under control.
Torque tube interference: String cables needed a secure and tidy routing system to pass over the Nextracker torque tube motors without impacting system function.
Risk of project delays: With large contractor teams on-site, work stoppages due to delayed materials would lead to project delays and cost overruns.